Tuesday, September 11, 2007

Field Tour

Field Tour Itinerary

PLLL/CHK own and have access to 75 multi-well sites...we visited only 8 sites

Started at Brentwood #1 - First three wells drilled about 24months ago...This will be a 20well pad. Think about this math...each pad is a 60-80bcfe field. Assuming well recovers 3-4bcfe and the pads access 800-1,000 acres...(50-acre spacing)

Brentwood #2 location - Will be a central facility ...was a ball field...now its a gas field

Next two pads...Bahan, TRWD

Then we went to the drive-in theater..Hickman location

The 4th Street Pad name alone tells the tale...this stuff is in the middle of the city

Finally Hudson and Mercato locations...

Monday, September 10, 2007

Compression and Pipeline Tie In Video

Click to Play to hear about new pipeline capacity by mid-08


Installed 8-27-07...see the inspection point


Drilling Pad Pictures



20 well drilling pad video

Unconstrained vs. Gathering back pressure constrained

Click Play for Narration

Zoomable picture


Drive-In Drilling Pad

One well producing, one unloading. Tested 3mmcf/d on 12/64th with high ftp

First Drilling Pad

Old well near ground with three wells in the distance. White vessels hold corrosion inhibitor.




Well site being prepared and expanded



Lot's of space for new wells